Description of the project

The Ivori-Irri dredging project kicked of in 2002 and it involved 4 other companies: Vibrojeniczebra Limited, Callidor Line Ltd, Comfort France and Nikimbog Limited.

The dredging project involved reclaiming of lost lands close to the water logged Ada-Ivrogbo boundaries.

The Problem

The basic challenge was to stop the erosion of the left over land which has been eroded to the span of 23%. Stopping the erosion of the land was a critical step as this will prevent future erosion of the  present reclaimed land. land

The Strategy

Stop the erosion, re-enforced the boundaries and reclaim lost or eroded land-spaces by dredging & filling.

Ivori Community

What our clients say?

“I am alone, and feel the charm of existence in this spot, which was created for the bliss of souls like mine and yet I feel that I never was a greater artist than now.”

Emily R. King
Manager, Nikimbo Ltd.

"Our Community has gotten back its lost heritage"

Kelly Onoriode
CEO Viral World